1992

Hwa yong Technology Co., Ltd.-Formally established.

1992

The first clean room project of a national academic research unit-isotope analysis laboratory. (Academia Sinica)

1996

Began to obtain the distribution and agency rights of international brand industrial products such as 3M, DUPONT, KIMTECH, NILFISK, SAKURAI, etc. in Europe, America and Japan.

1997

The first overseas project (Ho Chi Minh City, Vietnam)-Japan’s Ajinomoto dust-free (fungus) food processing plant was built.

1998

The first key project-the clean room air-conditioning project of the new factory of MIT. (Clean room area 1800M2, general air conditioning area 3300M2, total air conditioning: 400RT refrigerated tons)
The first ultra-clean and dust-free sterile room project (Class 1)-Nanya Technology. (Clean room area 1270M2, total air conditioner: 300RT freezer)

1999

The first key project in mainland China-Suzhou Jingpeng Electronic Clean Room and HVAC Project. (Clean room area 3000M2, general air-conditioning area 8000M2, total air-conditioning: 1165RT freezer)

2000

Beginning in mainland China, Hwa yong Technology China Branch was established to provide complete localized services in related fields of clean rooms. (Subsidiary Suzhou Hwa yong Purification Project/Kunshan Hwa yong Purification Equipment/Kunshan Aipui Co., Ltd.)

2001

Hwa yong Equipment Manufacturing Linkou Plant (area 1216M2) was completed, with its own production lines for folding, shearing, welding, and assembly, implementing a quality management mechanism, and strictly controlling product quality.

2004

Hwa yong Technology China Branch-Obtained the global leading brand of industrial explosion-proof special vacuum cleaners-Canadian Tiger-Vac (Huwei) general agent in mainland China.

2005

Large-scale construction of Kunshan Sanaisi Electronics Factory (Electronic Equipment Factory No. 1 / Semiconductor Factory No. 2)-Clean room and HVAC project. (1000KVA power capacity expansion installation project)

2006

The first major project to go to the United States-Jabil-clean room air conditioning project of Jabil Group. (Texas)

2007

Suzhou Jingpeng Electronics (Changshu S1/S2 Factory) built a clean room and HVAC project. (Clean room area 15200M2, HVAC area 18300M2, total air conditioner: 4240RT refrigerated tons)

2008

Hwa yong Clean Equipment Manufacturing Guishan Factory was completed (with an area of 2082M2), and a research and development office/quality control office was established to carry out equipment research and development and improvement, and strive to pursue a customized achievement rate and provide high-level clean equipment.

2009

The first reconstruction project-the isotope dust-free chemical laboratory project of the Academia Sinica. (Rebuilt after 16 years)

2010

American Jabil Technology-Clean Room Air Conditioning Project. (Mexico)

2011

Kunshan Sanaisi Electronics large-scale construction plant (the third solar plant)-clean room and HVAC project. (1600KVA high and low voltage electrical rectification and installation project)

2014

Hwa yong Technology │ Taiwan, the cumulative number of customers exceeded 8,000.

2017

The new building of the Central Research Institute-clean room and HVAC project, special acid and alkali resistant laboratory, acid and alkali resistant cold storage project.
(Academia Sinica)

2018

Suzhou Jingpeng Electronics (Changshu S2-2 Factory) built a clean room and HVAC project. (Clean room and HVAC area 21000M2, total air conditioning ice water machine: 1000RT. Air conditioning heat pump total: 1052KW)

2019

Hwa yong Technology │ Taiwan-Taipei Headquarters
Moved to the current location of <Far East World Center Building> in Xizhi District, New Taipei City (Taipei office area is 660M2).